Support Home

GENERAL.

70

Everything about Xylora Studios — who we are, what we do, how we work, and what makes us different.

01

How do I start a project with Xylora Studios?

Four steps: send a brief, lock the direction, work moves, files leave clean. Here is what to send and what happens next.

onboardingprocessbrief
02

What is Xylora Studios?

An independent creative studio operating across seven disciplines — web, app, music, artwork, anime, game concept, and video — from one team, under one roof.

aboutstudiooverview
03

What services does Xylora Studios offer?

Seven disciplines, one team. Here is the complete breakdown of what we do — and what we deliberately do not do.

servicesdisciplines
04

How long does a typical project take?

Typical ranges by discipline, plus what extends a timeline and what does not.

timelinescheduling
05

How do I reach an actual human, fast?

Submit a ticket — every ticket is read by the project lead, never a bot. First response within one business day, faster during active projects.

contacthuman
06

How decisions get recorded

Every scope decision lives in writing, so nobody relies on remembering a call.

processdocumentation
07

How we handle disagreement

When our recommendation and your preference differ, here is the order of operations.

processcommunication
08

Working across timezones

Asynchronous by default, with a small number of scheduled overlaps.

remotecommunication
09

How capacity is allocated

Slots are committed, not overbooked — which is why some answers are "not this month".

capacityscheduling
10

Accessibility as a default, not an extra

What is included by default and what needs an explicit audit.

accessibilitystandards
11

What a scope register is

The document that says exactly what is included, what is not, and what happens if that changes.

scopepackages
12

Confidentiality and NDAs

How unreleased work is handled, and how to request a signed agreement.

ndaconfidentiality
13

Small jobs and minimums

Why very small jobs sometimes get declined even when they seem easy.

scopecapacity
14

How do we communicate during a project?

One channel per project, one weekly written update, one synchronous call per milestone. Slack is not standard.

communicationprocess
15

Where can I see your portfolio?

Selected public work lives on the main studio site. Roughly half of our output is under NDA and never shown.

portfoliowork
16

What we are not good at

An honest list, so you can route those parts elsewhere.

fithonesty
17

Onboarding checklist

Everything collected in week one so production is not waiting on admin.

onboardingstart
18

What we need from you during a project

The three inputs that keep a project on its date.

clientassets
19

How we estimate time

Estimates come from deliverable count, unknowns and dependency risk — not gut feel.

estimatingtimeline
20

What changes a quote after it is issued

The four things that legitimately reopen a quote, and the things that do not.

quotescope
21

What we mean by "done"

A definition of done that is checkable, not a feeling.

deliverydefinition
22

Why we decline work

The four common reasons a project gets turned down, and how to tell which one applies to you.

fitcapacity
23

How approvals work

One decision owner, written approval, and what happens when approval stalls.

approvalprocess
24

How we use AI tools

Where generative tools are used, where they are not, and what you can require.

aipolicy
25

Glossary of terms we use

Plain definitions for the words that appear in scope registers and invoices.

glossaryreference
26

What makes Xylora Studios different from an agency?

In-house team, no subcontractors, four-day week, project-based pricing, full IP transfer. Trade-offs explained.

positioningabout
27

Why do you operate Monday through Thursday?

The four-day week is a studio policy, not a holiday. Friday covers maintenance, research, and rest.

scheduleoperations
28

What kinds of clients do you usually work with?

Independent creators, early-stage startups, established commercial brands, record labels, and game studios. Roughly half under NDA.

clientsfit
29

Writing a brief that gets a good answer

A one-page brief structure that works, with an example you can copy.

briefscope
30

Do you offer retainer or ongoing work?

Limited continuity blocks for existing clients. Not a substitute for an in-house team.

retainerongoing
31

How do I know if Xylora is the right studio for my project?

A short fit-check: scope, timeline, budget honesty, and decision authority. If three of four line up, send a brief.

fitselection
32

What happens if my brief changes before quote

How pre-quote changes are absorbed and when a revised scope path is needed.

briefchanges
33

Where is Xylora Studios based?

Registered in the United Kingdom. Team distributed across GMT and GMT+1. No physical walk-in studio.

locationabout
34

Can you help define the audience

How audience work is handled for sites, apps, campaigns, visuals, video, and game concepts.

audiencestrategy
35

How much direction do clients need to give

How to balance creative freedom with brand requirements, approval gates, and practical constraints.

directionclient-role
36

What does “one studio” actually mean

How single-accountability production avoids fragmented vendors while still keeping each discipline properly scoped.

studioworkflow
37

Can you take over from another supplier

How handover from another freelancer, agency, or internal team is assessed before any rescue work starts.

handoversupplier
38

How do referrals work

What to send when referring another client and how confidentiality is handled between separate engagements.

referralsprivacy
39

Can you review an existing project before quoting

How audits and project reviews work when a client already has files, a repo, footage, or designs.

auditquote
40

Do you offer strategy only work

When consulting, audits, scoping workshops, and direction documents can be booked without production.

strategyconsulting
41

What timezone does the studio use

How GMT operating hours work for international clients and how reviews are scheduled across time zones.

timezoneinternational
42

How long should I wait before following up

A practical guide to response windows and when a follow-up is useful rather than noisy.

communicationresponse
43

What makes a project easy to start

The assets, decisions, account access, and internal approvals that make the first week clean.

kickoffplanning
44

How do you handle mixed creative and technical projects

Why sites, apps, video, music, motion, and artwork can sit under one combined scope register.

multidisciplinaryscope
45

Do you work with established companies

How procurement, legal review, stakeholder sign-off, and brand governance are handled for larger organisations.

enterpriseprocurement
46

Do you work with creators and small teams

How independent creators, small businesses, founders, and labels can scope responsibly without agency overhead.

creatorssmall-business
47

Can you help if I only have a rough idea

How loose ideas become a scoped deliverable without forcing a client to know technical or creative terminology.

discoverybrief
48

Can you work under a launch deadline

How fixed dates, event launches, investor demos, and campaign schedules are assessed before acceptance.

deadlinelaunch
49

Who will I speak to during the project

How a single point of contact works and when specialists join calls or review threads.

communicationteam
50

Response times and working hours

Monday to Thursday, 09:00–17:00 GMT, and what that means for your timezone.

hourscommunication
51

How many projects are active at once

Why the studio caps concurrent production and how that protects quality, attention, and delivery rhythm.

capacityquality
52

How public holidays affect project timelines

How bank holidays, studio closures, and client-side closure windows are handled in schedule planning.

scheduleholidays
53

What happens in the first 48 hours

The commission quote window explained hour by hour, and what can delay it.

timelinecommission
54

How the Monday to Thursday schedule affects clients

What the four-day operating window means for replies, project plans, urgent issues, and realistic deadlines.

scheduleoperations
55

When Xylora Studios will decline a brief

The practical reasons a project may be refused before quote: poor fit, unclear ownership, impossible timeline, or unsafe content.

fitscope
56

How to write a useful one-page brief

A compact structure for explaining the goal, audience, deliverables, constraints, references, and approval path.

briefplanning
57

What happens after you submit a brief

The exact review path: intake, fit check, questions, scope register, deposit, and scheduled production slot.

briefonboarding
58

Working alongside your internal team

How we split responsibility when your team builds or maintains part of the work.

collaborationhandover
59

Choosing between a package and a commission

How to decide whether a visible package register or an open bespoke brief is the right starting point.

packagescommissionscope
60

Working with a small studio

How capacity, direct ownership, and decision speed work when the same people scope and produce the job.

capacitystudioprocess
61

Who you are actually talking to

No account managers, no handoff to a junior after the pitch.

studioteam
62

What good references look like

How to send references that actually steer the work rather than confuse it.

referencesbrief
63

How feedback should be written

Describe the problem, not the fix — and you will get a better second version.

feedbackprocess
64

Communication channels we use

One thread per project, files in one place, and why we avoid tool sprawl.

communicationtools
65

Do you participate in unpaid pitches or competitions?

No. We charge for paid pitch work and decline speculative competitions. A short paid discovery is the alternative.

pitchesspeculation
66

What languages and timezones do you work in?

English for all written work. Project delivery in GMT/GMT+1. International clients welcome with adjusted call windows.

languagestimezones
67

Packages versus commissions: which one fits

A package has a published scope register. A commission is written around your brief. Here is how to choose.

packagescommissionscope
68

Revision rounds: what actually counts as one

A round is one consolidated set of feedback, not each message you send.

revisionsscope
69

Project pauses and restarts

What happens to your slot, your files and your quote when a project goes quiet.

schedulingpause
70

How we read a first enquiry

What we look for in the first message you send, and why vague enquiries take longer to answer.

enquiryprocess